92 &102 Days 10-12 Progress (Sat, Sun, Mon)

92

TBA

102

Over the weekend, the ground around the new VDSL2 cabinet was finished with a concrete surround;  and on Monday the hole exposed to make the power connection was re-filled, and the Openreach engineer was on site to complete the copper cabling works.

Openreach have also reconfirmed directly with us the current progress on PCPs 92 and 102, as part of a wider update:

  • 92 – Stood, powered, coppered, and fibre Mon/Tues. Waiting for M+C.
  • 102 – Stood, powered, copper today and fibre Mon/Tues next week.