92 &102 Day 4 Progress (Sunday)

On Sunday afternoon the cabinet plinths for both PCPs 92 and 102 were put in place, with the ‘templates’ used to form the foundations being removed first.

PCP102

PCP102 FTTC Install Day 4
PCP102 FTTC Install Day 4
IMAG5302
PCP102 FTTC Install Day 4
IMAG5305
PCP102 FTTC Install Day 4
IMAG5306
PCP102 FTTC Install Day 4
IMAG5308
PCP102 FTTC Install Day 4
IMAG5309
PCP102 FTTC Install Day 4

PCP92

IMAG5312
PCP92 FTTC Install Day 4
IMAG5315
PCP92 FTTC Install Day 4
IMAG5317
PCP92 FTTC Install Day 4